GenetixBayEST. 2009
Jardin WaterWorks · water, dosing and roots · early access

The water stays outside. The roots get what they need.

A mixing station beside your tent that fills, doses by weight, mixes, checks and feeds; one tank family with interchangeable lids; and root hardware for every way of growing, from coco to high-pressure aeroponics. No pump ever sits in the water.

92 Lbatch from the Mix 90, checked before release Designed
31 minfill, dose, mix and settle Modelled
±5%EC against prediction, or the batch is held Designed
0 pumpsin any reservoir or root chamber Designed
190 mmfloor grid: six M pods fill a 4x4 Designed
WaterWorks Mix 90: stock bottles, dose rail, control cap, reservoir and fresh-water drawer3D render · Mix 90

Concept renders made from the design files, not product photos. Every figure is a design target Designed or a first-pass sum Modelled. The Mix Pro station behind WaterWorks has been mixing for over nine years; the production parts are built once tooling starts.

360° · every side

Turn it round.

Drag a picture to turn it, or press Spin. Each one is 24 views of the same design that is behind every other picture on this page: concept renders, not product photos.

Mix 90

RootPod DWC

RootPod HPA

Three stations · one design Designed

Mini, 90 and Pro. Same parts, three sizes.

Every Mix station is the same machine: a fresh-water drawer in the base, the mixing tank above it, a dose rail of bottles on weigh pads, the hydraulics and the ZoneManifold. The sizes differ in batch, in how many stocks they can dose on their own, and in how many zones they feed.

WaterWorks Mix Mini, Mix 90 and Mix Pro side by side3D render · the three stations
WaterWorks Mix Mini station
Mix Mini · for one tent
A batch
39.6 L
Fresh-water drawer
80 L, two batches
Dose rail
Dose 4: a bottled feed and pH down
Zones
4, one valve and meter each
A batch, start to finish
about 15 min
Rack
SR-Compact
WaterWorks Mix 90 station
Mix 90 · for one to four tents
A batch
92.3 L
Fresh-water drawer
188 L, two batches
Dose rail
Dose 8: six elements on their own channels and the pH pair
Zones
8, one valve and meter each
A batch, start to finish
about 31 min
Rack
SR-Standard
WaterWorks Mix Pro station
Mix Pro · for several rooms
A batch
146.8 L
Fresh-water drawer
302 L, two batches
Dose rail
Dose 16: every element on its own channel, the pH pair, a sanitiser and a spare
Zones
16, one valve and meter each
A batch, start to finish
about 48 min
Rack
SR-Pro
Run the station · from the tap to the roots Modelled

Fill. Dose. Top up. Set the pH. Then send it.

The whole system, the way it is designed. The Source fills the fresh-water drawer in the station's base. You pump the mixing tank to 80 %, dose one stock at a time, top up the rest, let it settle and only then set the pH. A verified batch goes through the ZoneManifold to the reservoirs you choose: each zone can feed a different system in a different tent, and the roots only ever draw from their own reservoir. Do it step by step, or press Automate and watch it keep everything fed, day after day.

Your water
Station
More settings · dosing, pH down, EC units, your own water
How you dose
Growing in
pH down
Show EC as
Day 1 · 00:00Everything is empty. Start with step 1: turn the Source on.
pH–
3456789
EC–

Fresh-water drawer
Mixing tank
Alkalinity

Speed
The ZoneManifold · · one valve at a time, a flow meter and a 6 L/min limiter on each · pick each zone's system, recipe and reservoir
Mix and verify a batch first.
The dose rail · one channel at a time, every bottle on a weigh pad · tap to dose, hold to pump
In the mixing tank · every element on its own row, split by where it came from
Every + has a − · the tank's ions in meq/L

Positive and negative charge always balance. EC counts every ion; pH is the tiny share of hydrogen left over once the buffers, bicarbonate and phosphate, have had their say. Acid turns bicarbonate into carbon dioxide, which bubbles off as the tank circulates.

Modelled: pH is solved from the charge balance of every ion, with the carbonate, phosphate and ammonium equilibria at 25 °C and Davies activity corrections; carbon dioxide leaves towards equilibrium with air, faster while the tank circulates. EC is the sum of each ion's conductivity, corrected for concentration, which reads the knowledge base's veg recipe at about 1.8 mS/cm. Salts, recipes and ranges are from our feed-by-stage guide; alkalinity and acids from water quality. The Source (about 1 L/min through RO, 6 L/min through sediment and carbon), the drawer of two batches, the 12 L/min transfer, the dose pumps, the mix, the verify gates and the manifold are the Mix 90's design targets; each system's daily drink is a typical tent's, and recirculating reservoirs drift up in pH as plants take nitrate. A sketch to learn from, not a feeding recommendation.

Every method · one interface

However you grow, it fits.

Every pod uses the same RootPort interface: feed, drain, air and the bus. The station doesn't care which one is on the other end.

RootPod DWCRootPod DWC
RootPod DWC cut openCut open

Roots hang in aerated solution. The air pump sits outside the tent; the diffuser bars put no heat into the water.

Every RootPort method side by sideEvery method, one interface
Kit your tent · on the 190 mm grid Designed

Fill the floor. See the order.

Everything that stands on a tent floor is a whole number of 190 mm units, so it packs edge to edge. Pick your tent and method; the plan packs it and the list is what you'd reserve.

Method
The station · Mix 90

Built from the floor up, heaviest at the bottom.

Fresh-water drawer at the base, the reservoir on a weigh base above it, a hydraulic bay with every pump dry-mounted, stock bottles each on its own scale, a dose rail of peristaltic heads, and a control cap with a hardware stop. No mains voltage inside the rack.

From the front3D render
Cut open · labels from the model

Inside every part, named.

Hover or tap a part, or take the tour. The labels carry the part numbers the render was built from.

WaterWorks Mix 90 station
3D render · labels from the model
    The four rules

    Four rules, everything follows.

    The whole platform is built from four decisions.

    The water stands outside the tent
    01

    The water stands outside the tent

    The station holds the system's water: fresh water in its base and the reservoir above it. A room is cooler than a tent, and a reservoir you can reach is one that gets cleaned.

    No pump is ever submerged
    02

    No pump is ever submerged

    Every pump is dry-mounted and draws through a screened bulkhead. A submerged pump gives all its power to the solution as heat: 14 W in a 36 L pod is about 0.34 °C an hour.

    One floor grid
    03

    One floor grid

    Everything that stands on a tent floor is a whole number of 190 mm units. Six M pods fill a 4x4 to 94 %.

    Every method is welcome
    04

    Every method is welcome

    Coco, soil, drip, flood, DWC, RDWC, NFT, high-pressure aero, clones and seedlings: no grower has to change how they grow.

    The range

    Seven families, one bus.

    Every device joins the same Jardin Core bus as the EC Flow controller and the Lumen driver, and mounts on the tent's J-Mount pattern.

    WaterWorks Mix

    WaterWorks Mix

    Mix Mini, Mix 90, Mix Pro and the Mix Extension

    TankWorks

    TankWorks

    One tank family, six lids, 23 insert plates

    RootPort pods

    RootPort pods

    DWC, Duo, SOG, HPA, Drip, Flood, Kratky

    RootLink

    RootLink

    RDWC, Aero and Flood sites sharing the station's reservoir

    PotWorks

    PotWorks

    Coco and soil on a runoff tray

    Nursery

    Nursery

    Clone trays, plug trays, ClonePods

    Jardin Air

    Jardin Air

    CO2, Canopy Sense, Air Guard and Reserve

    Specs · design targets Designed

    The numbers, labelled for what they are.

    Volumes, flows, pressures and cycle times are first-pass sums from the platform's assumptions. Dose accuracy, oxygen, misting and runtime are tests for the first samples.

    StationFresh-water drawerReservoirBatchDose channelsCycleTransfer
    WaterWorks Mix Mini80 L44 L40 L415 min12 L/min
    WaterWorks Mix 90188 L103 L92 L831 min12 L/min
    WaterWorks Mix Pro302 L163 L147 L1648 min12 L/min

    What's done

    • Fully engineered. Stations, tanks, lids, plates, pods, links and the PressureCore, each drawn and specified, with hydraulics, gas, power and fit checked and every render checked against its parts list.
    • A batch defined. Nine gated stages, with the checks that hold a batch.

    What the money buys

    • A first WaterWorks run. Mix and tank tooling, pods, dose heads and the ProbeBlock.
    • Testing. Dose accuracy by weight, flows and pressures, misting, and leak and shut-off tests.
    • Only if the goal and its reservations are met. If not, every deposit comes back.
    Founding Members · first in line

    Help take WaterWorks from drawings to your grow.

    Reserve on Fund the Bay with a refundable deposit, or join the waitlist to follow the build.